Hot News

The Baoji Botanical Garden Bridge officially opens for trial operation

  • Categories:Zindn News
  • Author:
  • Origin:
  • Time of issue:2019-10-19
  • Views:0

(Summary description)ZINDN made his debut in "C" position "perfectly" again! This time, Zinc Shield assisted the construction of the first all-welded bridge in the country and the largest steel truss arch bridge in the northwest, the Baoji Botanical Garden Bridge, officially opened to traffic! Zinc shield people proudly added a shining touch to the city's economic development!

The Baoji Botanical Garden Bridge officially opens for trial operation

(Summary description)ZINDN made his debut in "C" position "perfectly" again! This time, Zinc Shield assisted the construction of the first all-welded bridge in the country and the largest steel truss arch bridge in the northwest, the Baoji Botanical Garden Bridge, officially opened to traffic! Zinc shield people proudly added a shining touch to the city's economic development!

  • Categories:Zindn News
  • Author:
  • Origin:
  • Time of issue:2019-10-19
  • Views:0
Information

A good news came from the front: ZINDN made another “perfect” debut at the “C” position! This time, Zinc Shield assisted the construction of the country’s first all-welded bridge and the largest steel truss arch bridge in the northwest, the Baoji Botanical Garden Bridge, officially opened to traffic! Zinc Shield is proud to Add a shining touch to the development of the city's economy!

 

 

With the help of ZINDN, the Botanical Garden Bridge is a beautiful "boy" in Baoji City

As the first steel truss arch bridge in the country to adopt a fully welded process, the construction process and accuracy requirements are very high. The steel truss arch of the main bridge adopts the steel support system to support the erection and installation process, and the construction accuracy error must be controlled within 10 mm. ZINDN Technology has undertaken the heavy anti-corrosion work of the 1,486-meter-long bridge, and the zinc shield anti-corrosion products provide strong and long-lasting protection for the bridge.

 

The Botanical Garden Bridge under construction, every detail of the protection, ZINDN "follows with you"

 

After the completion of the Botanical Garden Bridge, successfully debuted with ZINDN in the "C" position!

The Baoji Botanical Garden Bridge starts from Jiangtan Road in the south and crosses Weihe River and Yujianbao West Road and Xinfu South Road to the north along Sanhe Road. The main bridge is a three-span continuous steel truss arch bridge. The main bridge is 288m long and 30m wide. The completion and opening of the bridge to traffic will alleviate the traffic pressure between Weibin District and Jintai District on the north and south banks of the Weihe River. It is of great significance for Baoji City to improve the transportation network, promote urban development, and improve people's well-being.

 

The silhouette of the bridge construction. On the road of city construction, the Zinc Shield people have been working hard and struggling all the time

Scan the QR code to read on your phone

推荐新闻

Wuxi Huadong Zindn Science And Technology Co.,Ltd.

Headquarters contact number:

Free hotline:

E-mail:

Add:

9th Floor of Wei chuang Building, No.999 Gaolang East Road,Wuxi, Jiangsu, China

Copyright © 2021 Wuxi Huadong Zindn Technology Co., LTD     苏ICP备08010491号-1

搜索
Search